What would Isambard Kingdom Brunel have done?
HS2 will now never reach Manchester, and will reach Birmingham late. Spiraling costs and missed deadlines are are a problem in big UK projects. Could Brunel have done better?
It's 2024, and the Manchester extension of HS2 has been cancelled. The leg to Leeds was cancelled in 2021. The remaining line to Birmingham is now less than half the initial planned route, and will cost over double the initial budget. This is not exclusive to HS2; Sprialling costs and missed deadlines have become commonplace in big engineering projects, the UK is now one of the most expensive places in the world to build infrastructure, but Britain has a proud history of engineering, and one name in particular looms large - Isambard Kingdom Brunel. Ruthless, bloody minded and notoriously driven - what could he do about the current state of UK infrastructure?
Presenter: Neil Maggs
Producer: Johnny I'Anson
Editor: Clare Fordham
Last on
More episodes
Previous
Broadcast
- Mon 11 Mar 2024 20:30麻豆社 Radio 4
Podcast
-
Analysis
Programme examining the ideas and forces which shape public policy in Britain and abroad.